Completed project

Remedial agricultural drainage

Alongside an electricity infrastructure project

We developed and installed a remedial drainage scheme alongside an electricity infrastructure project, taking the work from ground assessment and drainage design through to installation and handback.

Discuss similar work
Excavator beside a stone-filled drainage trench in an agricultural working area
Installing the remedial drainage.

01 / INVESTIGATION

Understand the ground.

We were brought in to address waterlogging on agricultural land following utility duct installation. The photograph shows the pre-existing conditions. Our initial walkover assessed the ground and identified where further investigation was needed.

We then assessed the drainage route, measured the affected sections and checked existing connections and outlet levels. These findings defined the remedial scope.

Standing water around existing chamber covers in an agricultural working area before remedial drainage
Pre-existing waterlogging — the conditions ADM was brought in to address.

02 / DRAINAGE DESIGN

Make the levels work.

The scheme needed to intercept water beneath the existing duct installation and carry it away through collectors to suitable outlets. The available fall determined where each run could break away from the utility corridor.

We developed the drainage layout and outline pipe sizing, bringing the collector runs, interception points, crossings and existing agricultural drain connections into a measured schedule of work.

03 / INSTALLATION

Build around the existing infrastructure.

The installation brought the designed routes together on the ground: collector drains, ditch outlets, a replacement gateway connection and links into the existing agricultural drainage.

At the duct route, the work included carefully hand-dug drainage beneath existing trunking, with gravel surrounds. The excavated ground was reinstated after installation.

Stone surround within an open drainage trench before backfilling
Stone surround before backfilling.

04 / COMPLETION & HANDOVER

Installed, reinstated and handed back.

The remedial drainage installation is complete and the site has been handed back. New collectors and outlets connect the interception points with the existing agricultural drainage system.

We arranged specialist aerial mapping alongside photographic records of the work. The map and animation below show extracts of the recorded drainage layout, with identifying details removed.

Aerial view of a rural working corridor with coloured lines showing recorded drainage routes and connectionsEnlarge drainage map
The recorded drainage layout, with collector runs and connections marked over the aerial image. Select the map to enlarge it.

This cropped example omits site names, dates and coordinates. The original georeferenced files are not included.

THE COMPLETED WORK

Follow the installed drainage.

16-second survey animation · no sound

An animated extract from the aerial survey, following the recorded drainage routes through the working area. Site names, dates and job totals have been removed.